Sunday, December 28, 2008
Centrel Railway at Mulund a Badlapur fast Train Broken Pentograph while changing the track from 1 to 3
Central Railway at Mulund a Badlapur fast Train Broken Pantograph while changing the track from 1 to 3 railway engineer experts says it is mistake of driver instead of to take pantograph down in changing track he has taken up and it heated to pillar and pantograph has damage and also overhead wire has broken and thousands of public has suffered for 4 hours in train
Subscribe to:
Posts (Atom)
Popular Posts
-
PRESS-NOTE On 04/11/2011 at about 12.15 hours, three unknown persons came in a numberless M/Cycle and fired two rounds at the office of ...
-
Imagine a same brand, same quantity, same packing having double MRP (Maximum Retail Price) in Mall then the MRP it has for selling in small...
-
CAR of BJP MLA SARDAR TARASINGH crashed into Mulund Traffic Chowky The Driver of a Vehicle belonging to BJP MLA SARDAR TARASINGH crash...
-
http://electionmsd.blogspot.in/
-
The Plant & Animals Welfare Society – Mumbai (PAWS-Mumbai) is a registered organisation that was founded in 2002 by some likeminded yout...